Flowshop scheduling with interstage job transportation
Authors:
- 25 November 2014
- journal article
- Published by Springer Nature in Journal of Scheduling
- Vol. 18 (4) , 411-422
Abstract
No abstract availableKeywords
This publication has 25 references indexed in Scilit:
- Modeling and scheduling a case of flexible flowshops: Total weighted tardiness minimizationComputers & Industrial Engineering, 2009
- Flowshop scheduling problems with transportation or deterioration between the batching and single machinesComputers & Industrial Engineering, 2009
- Two-machine shop scheduling with an uncapacitated interstage transporterIIE Transactions, 2005
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hardEuropean Journal of Operational Research, 1996
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One StageJournal of the Operational Research Society, 1995
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991
- Scheduling of a Two-machine Flowshop with Travel Time Between MachinesJournal of the Operational Research Society, 1991
- Scheduling Parts in a Combined Production-transportation Work CellJournal of the Operational Research Society, 1990
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954