An improved MOEA/D for multi-objective flexible job shop scheduling by considering efficiency and cost
Authors:
- Biao XiaoBXBiao Xiao
- Zhengcai ZhaoZZZhengcai Zhao
- Yingchen WuYWYingchen Wu
- Xialin ZhuXZXialin Zhu
- Shixin PengSPShixin Peng
- Honghua SuHSHonghua Su
- 19 April 2024
- journal article
- research article
- Published by Elsevier in Computers & Operations Research
- Vol. 167
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China
This publication has 39 references indexed in Scilit:
- An improved artificial bee colony algorithm for solving multi-objective low-carbon flexible job shop scheduling problemApplied Soft Computing, 2020
- A research survey: heuristic approaches for solving multi objective flexible job shop problemsJournal of Intelligent Manufacturing, 2020
- Robustness measures and robust scheduling for multi-objective stochastic flexible job shop scheduling problemsSoft Computing, 2016
- Particle swarm optimization algorithm embedded with maximum deviation theory for solving multi-objective flexible job shop scheduling problemThe International Journal of Advanced Manufacturing Technology, 2015
- Hybrid discrete particle swarm optimization for multi-objective flexible job-shop scheduling problemThe International Journal of Advanced Manufacturing Technology, 2013
- A memetic algorithm based on a NSGAII scheme for the flexible job-shop scheduling problemAnnals of Operations Research, 2010
- Many-Objective Test Problems to Visually Examine the Behavior of Multiobjective Evolution in a Decision Space2010
- Tabu search for the job-shop scheduling problem with multi-purpose machinesOR Spectrum, 1994
- Routing and scheduling in a flexible job shop by tabu searchAnnals of Operations Research, 1993
- New trends in machine schedulingEuropean Journal of Operational Research, 1988