ARC Flash Anaysis for Electrification Projects How Far Upstream and Downstream Should be Re-Evaluated a Refinery Case Study

Authors:

Abstract
This paper [1] will review the implementation and share lessons learned of an arc flash analysis study that was performed in support of a large infrastructure refinery project in Southern California. This paper is a follow-up to PCIC2024-5 paper titled “THE PATH TO DECARBONIZATION TROUGH ELECTRIFICATION, A REFINERY CASE STUDY AND LESSONS LEARNED” [2] Parra et al., 2024] presented in the General session in Orlando, FL. Because of the extensive modifications to the existing refinery facilities, short-circuit and arc-flash (AF) incident energy (IE) values were re-evaluated. This paper will review how far upstream and downstream the re-evaluation took place. The goal of this paper is to serve as a reference and refresher guide for protection engineers performing arc-flash analysis. The goal of arc-flash analysis is to ensure full compliance with the project criterion established with the latest standards and regulations. The arc flash levels identified in the study and NFPA 70E allow the facilities to classify the IE at various locations to help identify the proper personal protective equipment (PPE) rating to ensure personnel safety.