Abstract
The objective of this paper is to present and share experiences and challenges in Voltage VAR optimization (VVO) real time closed loop deployment at BC Hydro control center. VVO deployment at BC Hydro is focused to maximize energy savings and therefore the closed loop execution is required on continuous 24/7 basis. Several characteristic requirements for closed loop operation were integral for successful VVO deployment. This paper presents foundation elements for VVO closed loop real time execution and some deployment challenges from the system first year of operation.Keywords
This publication has 9 references indexed in Scilit:
- Load modeling and voltage optimization using smart meter infrastructure2013
- The benefits and challenges of the Integrated Volt/Var Optimization in the smart grid environment2011
- BC Hydro's experience on Voltage VAR Optimization in distribution system2010
- Weighted least squares methods for load estimation in distribution networksIEEE Transactions on Power Systems, 2003
- Integrated volt/VAr control in distribution systems2002
- Volt/VAr control at distribution substationsIEEE Transactions on Power Systems, 1999
- A three-phase power flow method for real-time distribution system analysisIEEE Transactions on Power Systems, 1995
- Load to voltage dependency tests at B.C. HydroIEEE Transactions on Power Systems, 1995
- Volt/var control algorithm for modern distribution management systemIEEE Transactions on Power Systems, 1995