Exploratory investigation of grouted bar-in-duct connections under direct tensile load
Authors:
- M. ElsayedMEM. Elsayed
- M.L. NehdiMNM.L. Nehdi
- D.J. Provost-SmithDPD.J. Provost-Smith
- O.S. EissaOEO.S. Eissa
- 1 September 2018
- journal article
- research article
- Published by Elsevier in Construction and Building Materials
- Vol. 183, 311-324
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Bond stress slip response of bars embedded in hybrid fibre reinforced high performance concreteConstruction and Building Materials, 2014
- Reinforcement and Concrete Bond: State Determination along the Development LengthJournal of Structural Engineering, 2013
- Post-yield bond behaviour of deformed bars in high-strength self-compacting concreteConstruction and Building Materials, 2013
- Direct Tension Pullout Bond Test: Experimental ResultsJournal of Structural Engineering, 2010
- Effect of FRP bar degradation on interface bond with high strength concreteCement and Concrete Composites, 2008
- Development of a precast concrete bent-cap systemPCI Journal, 2008
- Behavior and Modeling of Bond of FRP Rebars to ConcreteJournal of Composites for Construction, 1997
- Grout-Filled Pipe Splices for Precast Concrete ConstructionPCI Journal, 1995
- Tests of Yielding Anchorages under Monotonic LoadingsJournal of Structural Engineering, 1994
- Bar Yield Penetration in Monotonically Loaded AnchoragesJournal of Structural Engineering, 1994