A Risk Analysis Model in Concurrent Engineering Product Development
Authors:
- 14 September 2010
- journal article
- Published by Wiley in Risk Analysis
- Vol. 30 (9) , 1440-1453
Abstract
Concurrent engineering has been widely accepted as a viable strategy for companies to reduce time to market and achieve overall cost savings. This article analyzes various risks and challenges in product development under the concurrent engineering environment. A three‐dimensional early warning approach for product development risk management is proposed by integrating graphical evaluation and review technique (GERT) and failure modes and effects analysis (FMEA). Simulation models are created to solve our proposed concurrent engineering product development risk management model. Solutions lead to identification of key risk controlling points. This article demonstrates the value of our approach to risk analysis as a means to monitor various risks typical in the manufacturing sector. This article has three main contributions. First, we establish a conceptual framework to classify various risks in concurrent engineering (CE) product development (PD). Second, we propose use of existing quantitative approaches for PD risk analysis purposes: GERT, FMEA, and product database management (PDM). Based on quantitative tools, we create our approach for risk management of CE PD and discuss solutions of the models. Third, we demonstrate the value of applying our approach using data from a typical Chinese motor company.Keywords
This publication has 26 references indexed in Scilit:
- A Combined Monte Carlo and Possibilistic Approach to Uncertainty Propagation in Event Tree AnalysisRisk Analysis, 2008
- Risk Quantification for New Product Design and Development in a Concurrent Engineering EnvironmentCIRP Annals, 2006
- Knowledge elicitation for risk mapping in concurrent engineering projectsInternational Journal of Production Research, 2006
- A Simulation-Based Process Model for Managing Complex Design ProjectsIEEE Transactions on Engineering Management, 2005
- Efficient Monte Carlo simulation method of GERT-type network for project managementComputers & Industrial Engineering, 2002
- Measurement of instability in multi-level MRP systemsInternational Journal of Production Research, 1997
- Fuzzy logic prioritization of failures in a system failure mode, effects and criticality analysisReliability Engineering & System Safety, 1995
- Factors affecting the process of collaborative product development: A study of UK manufacturers of information and communications technology productsJournal of Product Innovation Management, 1995
- Factors Affecting the Process of Collaborative Product Development: A Study of UK Manufacturers of Information and Communications Technology ProductsJournal of Product Innovation Management, 1995
- The cost of inflated planned lead times in MRP systemsJournal of Operations Management, 1985