A GA methodology for the scheduling of yarn-dyed textile production
Authors:
- Hsi-Mei HsuHHHsi-Mei Hsu
- Yai HsiungYHYai Hsiung
- Ying-Zhi ChenYCYing-Zhi Chen
- Muh-Cherng WuMWMuh-Cherng Wu
- 1 December 2009
- journal article
- Published by Elsevier in Expert Systems with Applications
- Vol. 36 (10) , 12095-12103
Abstract
No abstract availableKeywords
This publication has 17 references indexed in Scilit:
- A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardinessApplied Mathematics and Computation, 2006
- Genetic algorithms for the optimal common due date assignment and the optimal scheduling policy in parallel machine earliness/tardiness scheduling problemsRobotics and Computer-Integrated Manufacturing, 2006
- Mathematical model and genetic optimization for the job shop scheduling problem in a mixed- and multi-product assembly environment: A case study based on the apparel industryComputers & Industrial Engineering, 2006
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibilityEuropean Journal of Operational Research, 2006
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costsComputers & Operations Research, 2005
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristicsEuropean Journal of Operational Research, 2005
- Job scheduling with dual criteria and sequence-dependent setups: mathematical versus genetic programmingOmega, 2004
- A REVIEW OF FLOWSHOP SCHEDULING RESEARCH WITH SETUP TIMESProduction and Operations Management, 2000
- Production planning and control in textile industry: A case studyComputers in Industry, 1996
- Expert system support in the textile industry: End product production planning decisionsExpert Systems with Applications, 1995