Full-scale experimental investigation on the seismic performance of PC columns before and after repair of grouting defects
Authors:
- Linlin XieLXLinlin Xie
- Xinyu WangXWXinyu Wang
- Bojian ZhongBZBojian Zhong
- Cantian YangCYCantian Yang
- Xi ChenXCXi Chen
- Qisong MiaoQMQisong Miao
- Qianmin LiuQLQianmin Liu
- 21 July 2022
- journal article
- research article
- Published by Elsevier in Journal of Building Engineering
- Vol. 58
Abstract
No abstract availableKeywords
Funding Information
- Beijing University of Civil Engineering and Architecture (JDYC20200308)
- National Key Research and Development Program of China (2019YFE0112800)
This publication has 18 references indexed in Scilit:
- Experimental bond behavior of deformed rebars in half-grouted sleeve connections with insufficient grouting defectConstruction and Building Materials, 2018
- Tensile behavior of half grouted sleeve connections: Experimental study and analytical modelingConstruction and Building Materials, 2017
- Seismic Analysis of Precast Concrete Bridge Columns Connected with Grouted Splice Sleeve ConnectorsJournal of Structural Engineering, 2017
- Grouted sleeve connections used in precast reinforced concrete construction – Experimental investigation of a column-to-column jointEngineering Structures, 2016
- Tensile strength of the grout-filled head-splice-sleeveConstruction and Building Materials, 2016
- Experimental investigation on the development of wear in grouted connections for offshore wind turbine generatorsEngineering Structures, 2016
- Non-proprietary bar splice sleeve for precast concrete constructionEngineering Structures, 2015
- PERFORMANCE OF GROUTED SPLICE SLEEVE CONNECTOR UNDER TENSILE LOADJournal of Mechanical Engineering and Sciences, 2014
- The relationship between interlocking mechanism and bond strength in elastic and inelastic segment of splice sleeveConstruction and Building Materials, 2014
- Feasibility study of grouted splice connector under tensile loadConstruction and Building Materials, 2014