Abstract
Facing the organizational and technological complexity of nuclear infrastructures (NI), the public reluctance in nuclear technology and the increasing restrictive regulatory environment, improving the conceptualization and evaluation of NI architecture is crucial for the successful completion of NI projects. Indeed, many technical engineering difficulties or delays in delivery can be avoided by deepening the design and evaluation of NI architectures. In a context where model‐based systems engineering (MBSE) is becoming more and more relevant, it is interesting to integrate evaluation into this process. Although the architecture evaluation (AE) process is rather well defined in the literature and linked to system analysis practices, it is quite difficult to deploy and pilot within complex NI projects. This article proposes a model‐based method, EVAluation for Critical Infrastructure Model Based System Engineering (EVA‐CIME), to facilitate the deployment of AE processes on a project. The components of this method are described and illustrated in a study of a NI design. The benefits and limitations of EVA‐CIME in its state of development are discussed and lead to the conclusion that the method should be extended to foster an AE culture within the company itself.Keywords
This publication has 16 references indexed in Scilit:
- Towards the systematic analysis of non-functional properties in Model-Based Engineering for real-time embedded systemsScience of Computer Programming, 2018
- What Is Systems Thinking?2017
- An MBSE Approach to Pass from Requirements to Functional ArchitectureIFAC-PapersOnLine, 2017
- A review of developments in technologies and research that have had a direct measurable impact on sustainability considering the Paris agreement on climate changeRenewable and Sustainable Energy Reviews, 2017
- A Framework for Identifying Causal Factors of Delay in Nuclear Power Plant ProjectsProcedia Engineering, 2016
- Tracking the consequences of design decisions in mechatronic Systems EngineeringMechatronics, 2014
- Climate Change 2013 – The Physical Science Basis2014
- The role of nuclear power in mitigating emissions from electricity generationEnergy Strategy Reviews, 2013
- Interpreting “systems architecting”Systems Engineering, 2012
- Hierarchical modeling of electric power system expansion by anylogic simulation software2005