Risks in Prefabricated Buildings in China: Importance-Performance Analysis Approach
Open Access
- 23 June 2019
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 11 (12) , 3450
Abstract
Prefabrication has drawn wide attention in China during the last decade. However, the market share of prefabricated buildings in China remains comparatively low. The Importance-Performance Analysis approach is employed in this study to investigate the crucial risk factors associated with prefabricated buildings in China. A preliminary list of risks associated with prefabricated buildings in China was developed based on a critical literature review, which was consequently refined by the interview with related experts. A questionnaire survey was then conducted with selected industry professionals to solicit their expert opinions of critical risks associated with prefabricated buildings in China. Findings show that attention should be paid to the following risks: improper decomposition system, low level of factory management, incompetent quality assurance system, deviation in specification of prefabricated components, defects of component system, missing catalogue of building parts and components, poor adaptability of prefabricated building during the operational stage, and lack of actual cases to prove the environmental benefits of prefabricated buildings. This study also revealed the discrepancy between perceived critical risks and those risks with comparatively lower management performance. These findings offer useful inputs for the future development of prefabricated buildings in China and beyond.Keywords
This publication has 48 references indexed in Scilit:
- Considering life-cycle environmental impacts and society's willingness for optimizing construction and demolition waste management fee: An empirical study of ChinaJournal of Cleaner Production, 2019
- Construction waste reduction behavior of contractor employees: An extended theory of planned behavior model approachJournal of Cleaner Production, 2018
- Analysis of delays in Tanzanian construction industryEngineering, Construction and Architectural Management, 2017
- Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction ProjectsJournal of Management in Engineering, 2016
- Impact of the Supervisor on Worker Safety Behavior in Construction ProjectsJournal of Management in Engineering, 2015
- Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: Two case studies of residential projectsEnergy and Buildings, 2013
- Carbon-Neutral Commercial Building DevelopmentJournal of Management in Engineering, 2013
- Quantifying the waste reduction potential of using prefabrication in building construction in Hong KongWaste Management, 2009
- Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case studyConstruction Management and Economics, 2008
- Safety Hazard Identification on Construction ProjectsJournal of Construction Engineering and Management, 2006