SaskPower’s Carbon Capture and Storage Facility on Unit 3 of SaskPower’s Boundary Dam Power Station (BD3 CCS Facility) was the first fully integrated commercial-scale carbon capture system on a coal-fired power plant and began operations in October 2014. Since then, this facility has experienced operational challenges that have resulted in more frequent capture facility outages than originally anticipated. Unforeseen fly ash and fly ash components buildup in the CCS facility have been a major concern. Heat transfer surfaces including the reboilers fouled over time and required cleaning to restore capacity. The packing in the absorbers and the strippers have also experienced accumulations of fly ash materials and organic deposits that limit the gas flow rate and reduce operational capacity as a result. This paper describes the ongoing activities that have reduced the frequency of unplanned outages, through on-line maintenance and proactive maintenance plans. Enhanced wash systems for the demisters in the absorbers extended the uptime between cleans from eight weeks to twelve months. A wash system for the booster fan enabled on-line cleaning. Duplicating heat transfer equipment with necessary isolations provided redundancy and allowed for on-line cleaning of this equipment. It was found that adaptations to allow on-line maintenance, combined with proactive and coordinated maintenance planning, have contributed to increased capture plant availability and reliability. SaskPower is working to address issues as part of their corporate continuous improvement process. The operating experience and lessons from this first-of-its-kind facility provide valuable knowledge for the development of new large-scale CCS facilities across industries and technology platforms.