Automatic Identification of Idling Reasons in Excavation Operations Based on Excavator–Truck Relationships
Authors:
- 1 September 2021
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 35 (5) , 04021015
Abstract
Excavators and trucks are important equipment for earthwork operations, which make major contributions to construction productivity. To control the work efficiency and productivity of earthwork equipment, computer vision (CV) methods have been proposed to monitor equipment operations from site surveillance videos. Existing methods can recognize equipment activities to estimate the working and idling times. Idling time is an important factor that influences equipment productivity; however, the causes of equipment idling have not been considered in previous CV methods. Therefore, this research proposes a method to identify the main causes of excavator and truck idling by analyzing their interactive operations. First, the activities of the excavators and trucks are identified using convolutional neural networks. Then, work groups of excavators and trucks are clustered. Finally, the relationships between each excavator and the surrounding trucks are analyzed to identify the potential reason for idling. The proposed method was validated with videos from several construction sites, and the results were promising.Keywords
This publication has 29 references indexed in Scilit:
- Server-Customer Interaction Tracker: Computer Vision–Based System to Estimate Dirt-Loading CyclesJournal of Construction Engineering and Management, 2013
- Part based model and spatial–temporal reasoning to recognize hydraulic excavators in construction images and videosAutomation in Construction, 2012
- Learning and classifying actions of construction workers and equipment using Bag-of-Video-Feature-Words and Bayesian network modelsAdvanced Engineering Informatics, 2011
- Estimation of earthworks execution time cost by means of artificial neural networksAutomation in Construction, 2010
- Multi-objective simulation-optimization for earthmoving operationsAutomation in Construction, 2008
- A computational intelligent fuzzy model approach for excavator cycle time simulationAutomation in Construction, 2003
- Artificial neural networks model for predicting excavator productivityEngineering, Construction and Architectural Management, 2002
- ESTIVATE: a model for calculating excavator productivity and output costsEngineering, Construction and Architectural Management, 2000
- Earthmoving Productivity Estimation Using Linear Regression TechniquesJournal of Construction Engineering and Management, 1999
- Estimating weather impact on the duration of construction activitiesCanadian Journal of Civil Engineering, 1997