Prediction of shield machine posture using the GRU algorithm with adaptive boosting: A case study of Chengdu Subway project
Authors:
- Haohan XiaoHXHaohan Xiao
- Zuyu ChenZCZuyu Chen
- Ruilang CaoRCRuilang Cao
- Yuxin CaoYCYuxin Cao
- Lijun ZhaoLZLijun Zhao
- Yunjie ZhaoYZYunjie Zhao
- 17 August 2022
- journal article
- research article
- Published by Elsevier in Transportation Geotechnics
- Vol. 37
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (52079150)
This publication has 40 references indexed in Scilit:
- Big Data for Development: A Review of Promises and ChallengesDevelopment Policy Review, 2015
- Predicting tunnel squeezing with incomplete data using Bayesian networksEngineering Geology, 2015
- Prediction of roadheader performance by artificial neural networkTunnelling and Underground Space Technology, 2014
- Root mean square error (RMSE) or mean absolute error (MAE)? – Arguments against avoiding RMSE in the literatureGeoscientific Model Development, 2014
- Learning Phrase Representations using RNN Encoder–Decoder for Statistical Machine Translation2014
- Automatic trajectory tracking control of shield tunneling machine under complex stratum working conditionTunnelling and Underground Space Technology, 2012
- Study on inner force and dislocation of segments caused by shield machine attitudeTunnelling and Underground Space Technology, 2008
- Theoretical Model of Shield Behavior During Excavation. I: TheoryJournal of Geotechnical and Geoenvironmental Engineering, 2002
- A Decision-Theoretic Generalization of On-Line Learning and an Application to BoostingJournal of Computer and System Sciences, 1997
- Determining the initial states in forward-backward filteringIEEE Transactions on Signal Processing, 1996