Urban Freeway Bridge Reconstruction Planning: Case of Mockingbird Bridge
Authors:
- 1 January 2000
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 126 (1) , 61-67
Abstract
Urban freeway bridge reconstruction is a challenging process. Sites are often located in heavily populated areas and are always congested with traffic and construction activities. Lack of adequate planning on such projects can result in tremendous waste in project cost and schedule, traffic flow efficiency, and most importantly, safety to both the traveling public and construction crews. Accordingly, a need exists to develop techniques to help plan and construct urban bridge projects more effectively. This paper documents the process of replanning a bridge project, Mockingbird Bridge. The case describes a research effort that beneficially applied several construction engineering concepts to the project. For the project, the research resulted in sizable savings in cost and duration. For the industry, the case resulted in several lessons for future projects. Among these, the primary lesson is that the integration of bridge reconstruction sequence, constructability, and traffic control plans is crucial to project success.Keywords
This publication has 2 references indexed in Scilit:
- Mitigating the Adverse Impacts of the Dallas North Central Expressway Construction on BusinessesTransportation Research Record: Journal of the Transportation Research Board, 1998
- An INDOT Lessons Learned Constructability Program and Integrated Multimedia System1994