Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
Author:
- 1 November 2002
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 143 (1) , 115-124
Abstract
No abstract availableKeywords
This publication has 6 references indexed in Scilit:
- Mixed integer programming for scheduling surface mount technology linesInternational Journal of Production Research, 2001
- Simultaneous versus sequential loading and scheduling of flexible assembly systemsInternational Journal of Production Research, 2000
- Mixed integer programming for scheduling flexible flow lines with limited intermediate buffersMathematical and Computer Modelling, 2000
- A lexicographic approach to bi-objective loading of a flexible assembly systemEuropean Journal of Operational Research, 1998
- Mathematical programming for the scheduling problem with alternate process plans in FMSComputers & Industrial Engineering, 1994
- A mixed integer program for loading and scheduling multiple flexible manufacturing cellsEuropean Journal of Operational Research, 1986