Prediction Model of Tunnel Boring Machine Disc Cutter Replacement Using Kernel Support Vector Machine
Open Access
- 22 February 2022
- journal article
- research article
- Published by MDPI AG in Applied Sciences
- Vol. 12 (5) , 2267
Abstract
During tunneling processes, disc cutters of a tunnel boring machine (TBM) usually need to be frequently and unexpectedly replaced. Regular inspections are needed to check disc cutters’ status, which significantly reduces the work efficiency and increases the cost. This paper proposes a new prediction model based on TBM operational parameters and geological conditions that determines whether disc cutter replacement is needed. Firstly, an evaluation criterion for whether the cutters need to be replaced is constructed. Secondly, specific parameters related to the evaluation criterion are analyzed and 18 features are established on tunneling monitoring information. Then, the mapping model between the cutter replacement judgement and the established features is built based on a kernel support vector machine (KSVM). Finally, the data obtained from a Jilin water transport tunnel project is utilized to verify the performance of the proposed model. Test results show that the new model can obtain an average accuracy of 90.0% and an average F1 score of 86.2% on field data prediction based on data from past tunneling days. Therefore, the proposed data-predictive model can be used in tunneling to accurately predict whether disc cutters need to be replaced before human judgment, and thereby greatly improve tunneling safety and efficiency.Keywords
Funding Information
- National Key Research and Development Program of China (Grant No. 2018YFB1702504)
This publication has 39 references indexed in Scilit:
- TBM performance and disc cutter wear prediction based on ten years experience of TBM tunnelling in IranGeomechanics and Tunnelling, 2015
- Modelling and prediction of tool wear using LS-SVM in milling operationInternational Journal of Computer Integrated Manufacturing, 2015
- Curve Boxplot: Generalization of Boxplot for Ensembles of CurvesIEEE Transactions on Visualization and Computer Graphics, 2014
- Introduction of an empirical TBM cutter wear prediction model for pyroclastic and mafic igneous rocks; a case history of Karaj water conveyance tunnel, IranTunnelling and Underground Space Technology, 2014
- Support vector machines applied to uniaxial compressive strength prediction of jet grouting columnsComputers and Geotechnics, 2014
- Periodic inspection of gauge cutter wear on EPB TBMs using cone penetration testingTunnelling and Underground Space Technology, 2013
- Forecasting penetration and wear for TBM drives in hard rock – Results from the ABROCK research project / Prognose von Penetration und Verschleiß für TBM‐Vortriebe im Festgestein – Erkenntnisse aus dem Forschungsprojekt ABROCKGeomechanics and Tunnelling, 2012
- Applications of NTNU/SINTEF Drillability Indices in Hard Rock TunnelingRock Mechanics and Rock Engineering, 2012
- Functional BoxplotsJournal of Computational and Graphical Statistics, 2011
- A fuzzy logic model to predict specific energy requirement for TBM performance predictionTunnelling and Underground Space Technology, 2008