Evaluation of risk impact of completion time changes combining PSA and DSA model insight and human reliability analysis
Authors:
- P. MartorellPMP. Martorell
- I. MartónIMI. Martón
- A.I. SánchezASA.I. Sánchez
- S. MartorellSMS. Martorell
- F. Sanchez-SaezFSF. Sanchez-Saez
- M. SaizMSM. Saiz
- 1 October 2018
- journal article
- research article
- Published by Elsevier in Reliability Engineering & System Safety
- Vol. 178, 97-107
Abstract
No abstract availableFunding Information
- Ministerio de Ciencia e Innovación (ENE2013-45540-R, ENE2016-80401-R, BES-2014-067602)
- European Regional Development Fund
This publication has 18 references indexed in Scilit:
- The future of risk assessmentReliability Engineering & System Safety, 2018
- Epistemic and aleatory uncertainties in integrated deterministic and probabilistic safety assessment: Tradeoff between accuracy and accident simulationsReliability Engineering & System Safety, 2017
- A dynamic probabilistic safety margin characterization approach in support of Integrated Deterministic and Probabilistic Safety AnalysisReliability Engineering & System Safety, 2016
- Human error probability estimation by coupling simulator data and deterministic analysisProgress in Nuclear Energy, 2015
- Evaluation of risk impact of changes to Completion Times addressing model and parameter uncertaintiesReliability Engineering & System Safety, 2014
- IMPROVEMENT OF THE LOCA PSA MODEL USING A BEST-ESTIMATE THERMAL-HYDRAULIC ANALYSISNuclear Engineering and Technology, 2014
- Evaluation of risk impact of changes to surveillance requirements addressing model and parameter uncertaintiesReliability Engineering & System Safety, 2014
- Probabilistic analysis of operators actions at the ignalina nuclear power plant taking account of the specific conditions of accident sequencesAtomic Energy, 2011
- Implication of PSA uncertainties on risk-informed decision makingNuclear Engineering and Design, 2011
- Success criteria time windows of operator actions using RELAP5/MOD3.3 within human reliability analysisJournal of Loss Prevention in the Process Industries, 2008