Abstract
The Danish power system is characterised by a high share of wind power production. Most of the wind power has so far been distributed onshore and connected to the lower voltage levels. The recent tendency is to group it in large offshore wind farms. The wind farms are often connected directly to the high voltage network via long AC cable lines compensated by shunt reactors. These cable connections impose some additional challenges that should be considered in the planning stage. This paper presents the recent experience of the Danish TSO with long cable connections of wind farms and shows the results of selected simulation studies made of the planned Horns Rev B wind farm connection.Keywords
This publication has 3 references indexed in Scilit:
- Excessive Over-Voltage in Long Cables of Large Offshore WindfarmsWind Engineering, 2006
- Wind Power in Power Systems2005
- Power System Harmonics2003