Refining hydropower operation by dynamic control of cascade reservoir water levels with flood season segmentation
Authors:
- Shaokun HeSHShaokun He
- BinBin LiBLBinBin Li
- Qianxun LiQLQianxun Li
- Hezhen ZhengHZHezhen Zheng
- Yingjian ChenYCYingjian Chen
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (52269003)
- National Key Research and Development Program of China (2022YFC3202803)
- Ministry of Water Resources (SKS-2022014)
This publication has 40 references indexed in Scilit:
- A novel impoundment framework for a mega reservoir system in the upper Yangtze River basinApplied Energy, 2022
- Optimal impoundment operation for cascade reservoirs coupling parallel dynamic programming with importance sampling and successive approximationAdvances in Water Resources, 2019
- Boosting hydropower output of mega cascade reservoirs using an evolutionary algorithm with successive approximationApplied Energy, 2018
- Identification of flood seasonality using an entropy-based methodStochastic Environmental Research and Risk Assessment, 2018
- Methodology that improves water utilization and hydropower generation without increasing flood risk in mega cascade reservoirsEnergy, 2018
- Floodwater utilization for cascade reservoirs based on dynamic control of seasonal flood control limit levelsEnvironmental Earth Sciences, 2017
- Joint Operation and Dynamic Control of Flood Limiting Water Levels for Cascade ReservoirsWater Resources Management, 2012
- Deriving Optimal Refill Rules for Multi-Purpose Reservoir OperationWater Resources Management, 2010
- Evaluation of stochastic reservoir operation optimization modelsAdvances in Water Resources, 2009
- Approximate Methods for the Estimation of Muskingum Flood Routing ParametersWater Resources Management, 2006