Research on resource-constrained multi-project scheduling problem considering resource substitution based on ant colony optimization
Authors:
- 1 September 2021
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 69-73
Abstract
Facing the R&D process of group enterprises, the substitutability of renewable resources is introduced into the resource-constrained multi-project scheduling problem, and a resource-constrained multi-project scheduling problem model considering the substitutability of resources is established. Ant colony optimization (ACO) is used to solve the model. By using the series schedule generation scheme (SSGS) and conflict resolution strategy, the efficiency of ACO is improved. The network example shows that the mathematical optimization model considering resource substitutability is closer to the actual management process of enterprise R&D projects, and the model can effectively shorten the total construction period of multi-projects and improve the efficiency of resource utilization.Keywords
Funding Information
- National Key R&D Program of China (2018YFB1701802)
This publication has 5 references indexed in Scilit:
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicInternational Transactions in Operational Research, 2019
- MIP models for resource-constrained project scheduling with flexible resource profilesEuropean Journal of Operational Research, 2014
- Introduction to the special issue: project scheduling under uncertaintyJournal of Scheduling, 2007
- Problems in managing internal development projects in multi-project environmentsInternational Journal of Project Management, 2003
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computationEuropean Journal of Operational Research, 1996