An improved two-stage optimization for network and load recovery during power system restoration
Authors:
- Shiwu LiaoSLShiwu Liao
- Wei YaoWei Yao
- Xingning HanXHXingning Han
- Jiakun FangJFJiakun Fang
- Xiaomeng AiXAXiaomeng Ai
- Jinyu WenJWJinyu Wen
- Haibo HeHHHaibo He
- 1 September 2019
- journal article
- research article
- Published by Elsevier in Applied Energy
- Vol. 249, 265-275
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (51577075)
This publication has 38 references indexed in Scilit:
- A Hierarchical Response-Based Approach to the Load Restoration ProblemIEEE Transactions on Smart Grid, 2015
- Coordinating generation and load pickup during load restoration with discrete load increments and reserve constraintsIET Generation, Transmission & Distribution, 2015
- Hybrid multiple attribute group decision-making for power system restorationExpert Systems with Applications, 2015
- Transmission system restoration with co-optimization of repairs, load pickups, and generation dispatchInternational Journal of Electrical Power & Energy Systems, 2015
- Sectionalizing strategies for minimizing outage durations of critical loads in parallel power system restoration with bi-level programmingInternational Journal of Electrical Power & Energy Systems, 2015
- A branch-and-cut method for computing load restoration plan considering transmission network and discrete load increment2014
- Permutation-based Power System Restoration in Smart Grid Considering Load PrioritizationElectric Power Components and Systems, 2014
- Two‐stage power network reconfiguration strategy considering node importance and restored generation capacityIET Generation, Transmission & Distribution, 2014
- Generalized congestion of power systems: insights from the massive blackouts in IndiaJournal of Modern Power Systems and Clean Energy, 2013
- From generic restoration actions to specific restoration strategiesIEEE Transactions on Power Systems, 1995