Stochastic optimisation of long-term block cave scheduling with hang-up and grade uncertainty
Open Access
- 6 February 2018
- journal article
- research article
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 33 (6) , 371-388
Abstract
Mass mining methods provide alternatives in developing deeper and lower-grade mineral deposits. Consequently, block cave mining has been increasingly popular mass mining method, especially for large copper deposits currently being mined by open pit methods. This study adopts similar concepts as in stochastic open pit production planning to the planning of block cave mines, to evaluate their effectiveness in a different approach to mass mining. The main contribution of this study is the incorporation of the uncertainty of delays from hang-ups and grades directly into the production scheduling process of a cave mining operation. Hang-up uncertainty relates to the uncertainty linked to the occurrence of ore that clogs the production draw points. This clogging causes time delays in the production cycle leading to tonnage losses and additional costs. Grade uncertainty is incorporated by means of stochastic orebody simulations. Both uncertainty sources are directly linked to the extraction decisions and influence the optimized schedules. The proposed stochastic integer programming model is applied to the optimization of the long-term schedule of a large-scale, low-grade copper deposit by taking into account hang-up delays in block caving. The results of the optimization maximizing net present value clearly show the capability of the formulation to mitigate the effects of both grade and hang-up uncertainty.Keywords
Funding Information
- Natural Sciences and Engineering Research Council of Canada (249942)
- Natural Sciences and Engineering Research Council of Canada (239019)
This publication has 23 references indexed in Scilit:
- A multi-step approach for block-cave production scheduling optimizationInternational Journal of Mining Science and Technology, 2013
- Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertaintyJournal of Mining Science, 2013
- A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertaintyEuropean Journal of Operational Research, 2012
- Production scheduling with uncertain supply: a new solution to the open pit mining problemOptimization and Engineering, 2012
- A sliding time window heuristic for open pit mine block sequencingOptimization Letters, 2011
- Stochastic optimization for strategic mine planning: A decade of developmentsJournal of Mining Science, 2011
- Stope design and geological uncertainty: Quantification of risk in conventional designs and a probabilistic alternativeJournal of Mining Science, 2009
- Stochastic integer programming for optimising long term production schedules of open pit mines: methods, application and value of stochastic solutionsMining Technology: Transactions of the Institutions of Mining and Metallurgy, 2008
- Block Simulation of Multiple Correlated VariablesMathematical Geosciences, 2008
- An application of integer programming and simulation to production planning for a stratiform ore bodyMining Science and Technology, 1990