Two-machine shop scheduling: Compromise between flexibility and makespan value
Authors:
- Carl EssweinCECarl Esswein
- Jean-Charles BillautJBJean-Charles Billaut
- Vitaly A. StrusevichVSVitaly A. Strusevich
- 1 December 2005
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 167 (3) , 796-809
Abstract
No abstract availableThis publication has 15 references indexed in Scilit:
- Project scheduling under uncertainty: Survey and research potentialsEuropean Journal of Operational Research, 2005
- Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open ShopsINFORMS Journal on Computing, 2001
- Robust scheduling of a two-machine flow shop with uncertain processing timesIIE Transactions, 2000
- A New Fully Polynomial Time Approximation Scheme for the Knapsack ProblemJournal of Combinatorial Optimization, 1999
- A new method for workshop real time schedulingInternational Journal of Production Research, 1996
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979
- Open Shop Scheduling to Minimize Finish TimeJournal of the ACM, 1976
- Technical Note—Finding Some Essential Characteristics of the Feasible Solutions for a Scheduling ProblemOperations Research, 1976
- An extension of Johnson's results on job IDT schedulingNaval Research Logistics Quarterly, 1956
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954