Operations and Shipment Scheduling of a Batch on a Flexible Machine
- 1 August 2003
- journal article
- Published by Institute for Operations Research and the Management Sciences (INFORMS) in Operations Research
- Vol. 51 (4) , 585-601
Abstract
We consider processing and shipment scheduling of a batch of size M jobs on a flexible (multifunctional) machine. All jobs in the batch require the same sequence ofNoperations on the machine. Costs are incurred in the forms of holding costs of jobs waiting for the next operation, setup costs whenever the machine is set up for a new operation, and shipment cost whenever the whole batch or a part of it is shipped to the customer. Using a dynamic programming formulation of the problem, we first show how the problem size increases inMandN. Then, by focusing on the properties of some classes of batch-splitting policies, a heuristic algorithm is presented that generates suboptimal policies. Some numerical results are provided which show that the algorithm performs very well.Keywords
This publication has 7 references indexed in Scilit:
- Control of a Single-Server Tandem Queueing System with SetupsOperations Research, 1998
- A two-stage tandem queue attended by a moving server with holding and switching costsQueueing Systems, 1997
- A suboptimality bound for permutation policies in single machine stochastic schedulingNaval Research Logistics (NRL), 1995
- Single-Visit Policies for Allocating a Single Resource in a Stochastic EnvironmentOperations Research, 1994
- Optimal stochastic scheduling of forest networks with switching penaltiesAdvances in Applied Probability, 1994
- On stochastic scheduling with precedence relations and switching costsJournal of Applied Probability, 1980
- Decomposition Algorithms for Single-Machine Sequencing with Precedence Relations and Deferral CostsOperations Research, 1975