Construction Progress Management System of Building Group Project Based on CIM Technology
- 13 October 2022
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 49, 1-8
Abstract
The construction process of building complex projects is complex, and the construction progress is often delayed. The current construction progress management system can only manage a single link separately, ignoring the connectivity of each link in the construction of the complex project, resulting in low management efficiency. In view of the above defects, this study designed a construction schedule management system for building group projects based on CIM technology. Based on the embedded hardware architecture, the three-dimensional construction model of the building complex project is established by using BIM. After analyzing the factors affecting the construction progress, the CIM technology is used to predict the construction progress. According to the prediction results, a construction schedule scheduling model is established to manage the project schedule. In the system test, the management system using CIM technology can basically control the construction progress to meet the design requirements. The management efficiency is as high as 90% and the performance is better.Keywords
This publication has 3 references indexed in Scilit:
- Human Memory Update Strategy: A Multi-Layer Template Update Mechanism for Remote Visual MonitoringIEEE Transactions on Multimedia, 2021
- A Survey of CRF Algorithm Based Knowledge Extraction of Elementary Mathematics in ChineseMobile Networks and Applications, 2021
- Fuzzy Detection Aided Real-Time and Robust Visual Tracking Under Complex EnvironmentsIEEE Transactions on Fuzzy Systems, 2020