Rethinking construction cost overruns: cognition, learning and estimation
Authors:
- Dominic D. Ahiaga-DagbuiDADominic D. Ahiaga-Dagbui
- Simon D SmithSSSimon D Smith
Open Access
- 7 April 2014
- journal article
- Published by Emerald Publishing in Journal of Financial Management of Property and Construction
- Vol. 19 (1) , 38-54
Abstract
Purpose: – Drawing on mainstream arguments in the literature, the paper presents a coherent and holistic view on the causes of cost overruns, and the dynamics between cognitive dispositions, learning and estimation. A cost prediction model has also been developed using data mining for estimating final cost of projects. The paper aims to discuss these issues.Design/methodology/approach: – A mixed-method approach was adopted: a qualitative exploration of the causes of cost overrun followed by an empirical development of a final cost model using artificial neural networks.Findings: – A conceptual model to distinguish between the often conflated causes of underestimation and cost overruns on large publicly funded projects. The empirical model developed in this paper achieved an average absolute percentage error of 3.67 percent with 87 percent of the model predictions within a range of ±5 percent of the actual final cost.Practical implications: – The model developed can be converted to a desktop package for quick cost predictions and the generation of various alternative solutions for a construction project in a sort of what-if analysis for the purposes of comparison. The use of the model could also greatly reduce the time and resources spent on estimation.Originality/value: – A thorough discussion on the dynamics between cognitive dispositions, learning and cost estimation has been presented. It also presents a conceptual model for understanding two often conflated issues of cost overrun and under-estimation.Keywords
This publication has 34 references indexed in Scilit:
- High-performance Concrete Compressive Strength Prediction using Time-Weighted Evolutionary Fuzzy Support Vector Machines Inference ModelAutomation in Construction, 2012
- Why costs overrun: risk, optimism and uncertainty in budgeting for the London 2012 Olympic GamesConstruction Management and Economics, 2012
- Dispute causation: identification of pathogenic influences in constructionEngineering, Construction and Architectural Management, 2010
- Construction cost analysis under uncertainty with correlated cost risk analysis modelConstruction Management and Economics, 2010
- Survival of the unfittest: why the worst infrastructure gets built--and what we can do about itOxford Review of Economic Policy, 2009
- Why the unskilled are unaware: Further explorations of (absent) self-insight among the incompetentOrganizational Behavior and Human Decision Processes, 2008
- Curbing Optimism Bias and Strategic Misrepresentation in Planning: Reference Class Forecasting in PracticeEuropean Planning Studies, 2007
- A VaFALCON neuro-fuzzy system for mining of incomplete construction databasesAutomation in Construction, 2006
- What Causes Cost Overrun in Transport Infrastructure Projects?Transport Reviews, 2004
- A computational intelligent fuzzy model approach for excavator cycle time simulationAutomation in Construction, 2003