BIM Uses for Mitigating Deficiencies in Road Scheduling Planning
Open Access
- 19 March 2025
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 17 (6) , 2729
Abstract
Efficient scheduling is essential for successful and sustainable road construction projects. However, conventional planning approaches often lack adaptability, visualization, and integration with modern technologies, leading to schedule deficiencies and cost overruns. Therefore, this paper studies the influence of BIM uses in mitigating planning deficiencies in road construction scheduling. A four-stage research method was employed: (1) identification of BIM uses relevant to road projects, (2) determination of principal causes contributing to scheduling deficiencies, (3) cross-impact analysis to quantify BIM’s influence on these deficiencies, and (4) expert interviews to characterize key BIM uses. Results highlight that 4D construction planning, quantity take-off and cost estimation, and traffic management planning positively impact road scheduling, reducing errors in work breakdown structures, resource allocation, and coordination between project stakeholders. BIM streamlines communication, supports proactive risk management, and enables real-time schedule adjustments by providing an integrated digital environment. This research shows the advantages of applying BIM in road construction to improve project planning, curtail scheduling setbacks, and encourage adopting innovative practices. The results provide information that planners can utilize to enhance the use of BIM in scheduling road construction projects.Keywords
Funding Information
- Pontificia Universidad Javeriana, Colombia (20673, 11230455)
- ANID FONDECYT Iniciación 2023 (20673, 11230455)
This publication has 86 references indexed in Scilit:
- Incorporating Artificial Intelligence Applications in Flexible Pavements: A Comprehensive OverviewInternational Journal of Pavement Research and Technology, 2024
- Web-Based Visual Project Progress (4D BIM) to Plan and Monitor in a More Lean and Efficient Way2023
- Understanding the perception differences on BIM adoption factors across the professions of AEC industryAin Shams Engineering Journal, 2023
- AI and IoT-based concrete column base cover localization and degradation detection algorithm using deep learning techniquesAin Shams Engineering Journal, 2023
- Herausforderungen und Perspektiven bei der BIM‐Planung von Brücken – das Beispiel der Geh‐ und Radwegüberführung RiederwaldBautechnik, 2023
- Approaches for BIM-based multi-objective optimization in construction schedulingAin Shams Engineering Journal, 2023
- Al-DeMat: A web-based expert system platform for computationally expensive models in materials designAdvances in Engineering Software, 2022
- Building Information Modeling (BIM) for transportation infrastructure – Literature review, applications, challenges, and recommendationsAutomation in Construction, 2018
- An IFC-inspection process model for infrastructure projects: Enabling real-time quality monitoring and controlAutomation in Construction, 2017
- Recognition of process patterns for BIM-based construction schedulesAdvanced Engineering Informatics, 2017