Preemptive Scheduling of Equal-Length Jobs to Maximize Weighted Throughput
Preprint
Abstract
We study the problem of computing a preemptive schedule of equal-length jobs with given release times, deadlines and weights. Our goal is to maximize the weighted throughput, which is the total weight of completed jobs. In Graham's notation this problem is described as (1 | r_j;p_j=p;pmtn | sum w_j U_j). We provide an O(n^4)-time algorithm for this problem, improving the previous bound of O(n^{10}) by Baptiste.Keywords
All Related Versions
This publication has 5 references indexed in Scilit:
- Ten notes on equal-processing-time scheduling4OR, 2004
- Polynomial time algorithms for minimizing the weighted number of late jobs on a single machine with equal processing timesJournal of Scheduling, 1999
- An O(n4) algorithm for preemptive scheduling of a single machine to minimize the number of late jobsOperations Research Letters, 1999
- Knapsack-like scheduling problems, the Moore-Hodgson algorithm and the ‘tower of sets’ propertyMathematical and Computer Modelling, 1994
- A dynamic programming algorithm for preemptive scheduling of a single machine to minimize the number of late jobsAnnals of Operations Research, 1990