Crane scheduling method for train reloading at inland intermodal container terminal
Authors:
- 1 September 2012
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 1949047X,p. 189-192
Abstract
The increase of the volume of containerized goods in the worldwide trade imposes the need for the analysis and improvement of all aspects of container transport logistic chains, and therefore also the organization of inland intermodal terminals and the mechanization for reloading of containers from ships (barges), trains and trucks. This paper analyzes the crane scheduling for the reloading of containers from/to trains at inland intermodal terminals. In order to find the exact solution for container reloading from/to a train, a branch and bound method was developed.Keywords
This publication has 8 references indexed in Scilit:
- Optimization of container quay cranes operations2011
- Comparison and evaluation of various cycle-time models for yard cranes in container terminalsInternational Journal of Production Economics, 2010
- Determining crane areas in intermodal transshipment yards: The yard partition problemEuropean Journal of Operational Research, 2010
- The Automatic Generation of Transhipment Plans for a Train–Train Terminal: Application to the Spanish–French BorderTransportation Planning and Technology, 2008
- Optimised loading patterns for intermodal trainsOR Spectrum, 2007
- Optimum Capacity for Intermodal Container TerminalsTransportation Planning and Technology, 2006
- Opportunities for OR in intermodal freight transport research: A reviewEuropean Journal of Operational Research, 2004
- Is a new applied transportation research field emerging?––A review of intermodal rail–truck freight transport literatureTransportation Research Part A: Policy and Practice, 2004