The antecedents of construction project change: an analysis of design and build procurement application
- 26 February 2021
- journal article
- research article
- Published by Emerald Publishing in Journal of Engineering, Design and Technology
- Vol. 21 (3) , 655-689
Abstract
Purpose: This study aims to excoriate, define and delineate the main drivers of “change” in commercial construction projects and generate guidelines on how to minimise exposure to the associated adverse effects upon project stakeholders. Design/methodology/approach: The research adopts mixed doctrines through a combination of epistemological lenses, embracing two primary philosophical stances: interpretivism, to identify the primary drivers of change based on a systematic literature review and a post-positivist, inductive approach to analyse the results of change within a Joint Contracts Tribunal (JCT) Design and Build (D&B) construction project case study. Findings: The causal nexus of change during the construction phase is assessed and delineated; the key affecting factors are thematically grouped under headings: extent and severity; time in relation to implementing; instigating party; individual(s) responsible for managing the change; reason for the change; available resource; recoverable or non-recoverable; contract/project type; and type of client. Following this, the effects of change on key elements of the project are encapsulated and recommendations for adaptations which may provide improved experiences are offered. Originality/value: The study tackles the common issue of managing the deleterious effects of change on commercial construction projects, defining management techniques to minimise stakeholder tribulation.Keywords
This publication has 22 references indexed in Scilit:
- Investigating the client-related rework in building projects: The case of SingaporeInternational Journal of Project Management, 2014
- Interpretive accounts and fairy tales: a critical polemic against the empiricist bias in interpretive IS researchEuropean Journal of Information Systems, 2014
- Engineering change: an overview and perspective on the literatureResearch in Engineering Design, 2010
- Research Validation: Challenges and Opportunities in the Construction DomainJournal of Construction Engineering and Management, 2010
- Case Study: A Strategic Research MethodologyAmerican Journal of Applied Sciences, 2008
- Quantified Impacts of Project ChangeJournal of Professional Issues in Engineering Education and Practice, 2007
- Validation of qualitative analytical methodsTrAC Trends in Analytical Chemistry, 2004
- Auditing the indirect consequences of rework in construction: a case based approachManagerial Auditing Journal, 2002
- Influence of Project Type and Procurement Method on Rework Costs in Building Construction ProjectsJournal of Construction Engineering and Management, 2002
- Quantitative Impacts of Project Change: Size IssuesJournal of Construction Engineering and Management, 1997