Construction and testing of arc dipoles and quadrupoles for the Relativistic Heavy Ion Collider (RHIC) at BNL
Authors:
- 19 November 2002
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 2, 1293-1297
Abstract
The production run of superconducting magnets for the Relativistic Heavy Ion Collider (RHIC) project at Brookhaven National Laboratory (BNL) is well underway. Of the 288 arc dipoles needed for the collider, more than 120 have been delivered. More than 150 arc quadrupoles have been delivered. All of these magnets have been accepted for RHIC. This paper reports the construction and performance of these magnets. Novel features of design and test, introduced to enhance technical performance and control costs, are also discussed.Keywords
This publication has 11 references indexed in Scilit:
- Improved cable insulation for superconducting magnets2002
- Field quality control through the production phase of RHIC arc dipoles2002
- Field quality evaluation of the superconducting magnets of the Relativistic Heavy Ion Collider2002
- Superconducting 8 cm corrector magnets for the Relativistic Heavy Ion Collider (RHIC)2002
- Combined element magnet production for the Relativistic Heavy Ion Collider (RHIC) at BNL2002
- Industrial production of RHIC magnetsIEEE Transactions on Magnetics, 1996
- Manufacture and testing of the superconducting wire and cable for the RHIC dipoles and quadrupolesIEEE Transactions on Applied Superconductivity, 1995
- Test of eight superconducting arc quadrupoles for RHICIEEE Transactions on Magnetics, 1994
- Performance of Field Measuring Probes for SSC Magnets1994
- Dipole Magnet Development for the RHIC Accelerator1990