A Continuous-Time Model for Multiple Yard Crane Scheduling with Last-Minute Job Arrivals
- 8 April 2015
- book chapter
- Published by Springer Nature
- p. 53-83
Abstract
No abstract availableKeywords
This publication has 17 references indexed in Scilit:
- The storage location assignment problem for outbound containers in a maritime terminalInternational Journal of Production Economics, 2012
- The integrated yard truck and yard crane scheduling problem: Benders’ decomposition-based methodsTransportation Research Part E: Logistics and Transportation Review, 2010
- Deployment strategies of double-rail-mounted gantry crane systems for loading outbound containers in container terminalsInternational Journal of Production Economics, 2008
- Optimizing the landside operation of a container terminalOR Spectrum, 2007
- Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithmInternational Journal of Production Economics, 2007
- A m‐parallel crane scheduling problem with a non‐crossing constraintNaval Research Logistics (NRL), 2006
- Crane scheduling in container yards with inter-crane interferenceEuropean Journal of Operational Research, 2005
- Crane scheduling with spatial constraintsNaval Research Logistics (NRL), 2004
- Sequencing delivery and receiving operations for yard cranes in port container terminalsInternational Journal of Production Economics, 2003
- A routing algorithm for a single straddle carrier to load export containers onto a containershipInternational Journal of Production Economics, 1999