Discussion of cutter-head opening design for earth pressure balance machines (EPBMs)
Authors:
- 1 December 2024
- journal article
- research article
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Geotechnical Engineering
- Vol. 177 (6) , 645-659
Abstract
Among the various parts of earth pressure balance (EPB) cutter-heads, the opening distribution on the cutter-head face plays a crucial role in the success of tunnelling projects in soft ground. The amount of published literature on this subject is very limited, however; as a result, tunnel-boring machine (TBM) manufacturers have developed different cutter-heads for soft ground, with varied opening distribution based on their experience. In this paper, as a first step, the results of field studies on cutter-heads’ opening design for soft ground are expressed. The paper then mainly focuses on numerical studies using the discrete-element method (DEM) to evaluate the adaptability of the EPB system and cohesive and non-cohesive soils’ fluidity by changing the opening distribution on the cutter-head. Finally, the optimum opening ratio and its distribution for different soils – by considering the important parameters of the value of the thrust force, cutter-head torque and soil fluidity condition – are proposed based on the analysis results from DEM. Furthermore, the flow characteristics of soil particles inside the EPB chamber are obtained through examination of the velocity field. In addition, practical aspects for further application in the TBM industry are discussed through the consideration of field studies and a real example.Keywords
This publication has 17 references indexed in Scilit:
- Cutterhead and Cutting Tools Configurations in Coarse Grain SoilsThe Open Construction & Building Technology Journal, 2017
- TBM performance through the engineering geology of the Lee TunnelProceedings of the Institution of Civil Engineers - Geotechnical Engineering, 2016
- The scheme design for the earth pressure balance shield cutterhead structureChinese Science Bulletin, 2014
- Discrete element model for performance analysis of cutterhead excavation system of EPB machineTunnelling and Underground Space Technology, 2013
- DEVELOPMENT OF TECHNOLOGY TO CONTROL AND MANAGE MUCK FLOW INSIDE EPB SHIELD CHAMBERJournal of JSCE, 2013
- Modeling and analysis of thrust force for EPB shield tunneling machineAutomation in Construction, 2012
- Determination of the cutterhead torque for EPB shield tunneling machineAutomation in Construction, 2011
- Discrete Numerical Model for Analysis of Earth Pressure Balance Tunnel ExcavationJournal of Geotechnical and Geoenvironmental Engineering, 2005
- EPBMs for the North East line projectTunnelling and Underground Space Technology, 1999
- A discrete numerical model for granular assembliesGéotechnique, 1979