Abstract
Bank protection is often employed to stabilize an alluvial channel and to reclaim land from a flood plain. For the sake of channel‐bed stability the hydraulic geometry of the channel must be designed so that its sediment‐transport capacity matches the supply from the upstream natural reach. Construction of a flood‐control channel in a flood plain usually increases the flow velocity and sediment transport. To maintain an approximate sediment equilibrium, the slope of the channelized reach is reduced using drop structures. The channelized reach and the natural reach have dissimilar geometries; their sediment‐transport rates are usually different under the changing discharge, and the channel as designed will undergo scour and fill during the design‐flood event. To account for the time‐dependent processes and general channel geometry, a mathematical model for water and sediment routing is used to determine the hydraulic geometry of erodible‐bed channels. The simulated sediment yield and its spatial variation are employed to arrive at the equilibrium (nonscouring and nonsilting) geometry at the peak discharge. Sediment transport and fluvial processes are also modelled to determine the depth of toe entrenchment. The computer‐aided design of channelization is illustrated by its application to Santa Gertrudis Creek in California.

This publication has 5 references indexed in Scilit: