Resource constrained scheduling simulation model for alternative stochastic network projects
- 10 June 2003
- journal article
- Published by Elsevier in Mathematics and Computers in Simulation
- Vol. 63 (2) , 105-117
Abstract
No abstract availableKeywords
This publication has 13 references indexed in Scilit:
- A heuristic for network project scheduling with random activity durations depending on the resource allocationInternational Journal of Production Economics, 1998
- A generalized activity network modelJournal of the Operational Research Society, 1997
- Stochastic network project scheduling with non-consumable limited resourcesInternational Journal of Production Economics, 1997
- Project Scheduling under Resource Constraints1995
- A two-level decision-making model for controlling stochastic projectsInternational Journal of Production Economics, 1993
- Scheduling under a Non-renewable Resource ConstraintJournal of the Operational Research Society, 1991
- Controlled alternative activity networks for project managementEuropean Journal of Operational Research, 1988
- A comparison between the VERT program and other methods of project duration estimationOmega, 1987
- Why Projects Are “Always” Late: A Rationale Based on Manual Simulation of a PERT/CPM NetworkInterfaces, 1981
- Project Scheduling under Resource Constraints—Historical Review and Categorization of ProceduresA I I E Transactions, 1973