A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams
- 1 December 2013
- journal article
- Published by Elsevier in Resources Policy
- Vol. 38 (4) , 591-597
Abstract
No abstract availableKeywords
Funding Information
- Natural Sciences and Engineering Research Council of Canada CRDPJ (411270-10)
This publication has 15 references indexed in Scilit:
- Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demandJournal of the Operational Research Society, 2013
- Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpilesResources Policy, 2012
- Optimal mining practice in strategic planningJournal of Mining Science, 2011
- A risk quantification framework for strategic mine planning: Method and applicationJournal of Mining Science, 2011
- Integrated open pit pushback selection and production capacity optimizationJournal of Mining Science, 2011
- Theory and method of genetic-neural optimizing cut-off grade and grade of crude oreExpert Systems with Applications, 2009
- Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper depositsResources Policy, 2008
- Optimum cut‐off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalationEngineering Computations, 2007
- Evaluating mine plans under uncertainty: Can the real options make a difference?Resources Policy, 2007
- Using a Combination of Genetic Algorithm and the Grid Search Method to Determine Optimum Cutoff Grades of Multiple Metal DepositsInternational Journal of Surface Mining, Reclamation and Environment, 2004