Feasibility Studies of a Soluble Boron-Free 900-MW(electric) PWR, Safety Systems: Consequences of the Partial or Total Elimination of Soluble Boron on Plant Safety and Plant Systems Architecture

Authors:

Abstract
A consistent study was conducted on the total or partial elimination of soluble boron within the framework of the French Commissariat à l’Energie Atomique/Nuclear Reactor Directorate/Innovation Program. Three options were studied: maintaining the soluble boron during cold shutdown; soluble boron only for accident conditions; total elimination of soluble boron. The approach used to identify the motivations that guided the studies on soluble boron reduction or elimination is summarized, and the essential results are presented.After a brief presentation of the objectives of these studies and of the results available in the literature, we comment on the safety means in use (for present reactors) as well as the options, of generic nature, which lead to increased safety in future reactors. The implications linked to the use of soluble boron in the coolant are described. The consequences for the reactor are briefly analyzed in terms of demands for reactivity control reinforcement and for the implementati...