Applying Constraint Programming and Integer Programming to Solve the Crew Scheduling Problem for Railroad Systems: Model Formulation and a Case Study
- 30 August 2021
- journal article
- research article
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2676 (1) , 408-420
Abstract
Crew scheduling is one of the crucial processes in railroad operation planning. Based on current regulations and working and break time requirements, as well as the operational rules, this process aims to find a duty arrangement with minimal cost that covers all trips. Most past studies considered this subject for railroad systems as an optimization problem and solved it with mathematical programming-based methods or heuristic algorithms, despite numerous logical constraints embedded in this problem. Few studies have applied constraint programming (CP) approaches to tackle the railroad crew scheduling problem. This paper proposes a hybrid approach to solve the problem with a CP model for duty generation, and an integer programming model for duty optimization. These models have been applied to the Kaohsiung depot of Taiwan Railways Administration, the largest railroad operator in Taiwan. The encouraging results show that the proposed approach is more efficient than the manual process and can achieve 30% savings of driver cost. Moreover, the approach is robust and provides flexibility to easily accommodate related operational concerns such as minimizing the number of overnight duties. Thus, this hybrid two-phase approach seems to have the potential for applications to the railroad crew scheduling problems outside Taiwan.Keywords
This publication has 20 references indexed in Scilit:
- Divide-and-price: A decomposition algorithm for solving large railway crew scheduling problemsEuropean Journal of Operational Research, 2012
- Tactical crew planning in railwaysTransportation Research Part E: Logistics and Transportation Review, 2011
- Optimizing Railway Crew Scheduling at DB SchenkerInterfaces, 2011
- An evolutionary and constructive approach to a crew scheduling problem in underground passenger transportJournal of Heuristics, 2009
- Operations Research Methods in Constraint Programming2006
- Program Does Not Equal Program: Constraint Programming and Its Relationship to Mathematical ProgrammingInterfaces, 2001
- Constraint satisfaction problems: Algorithms and applicationsEuropean Journal of Operational Research, 1999
- Subgraph ejection chains and tabu search for the crew scheduling problemJournal of the Operational Research Society, 1999
- Algorithms for railway crew managementMathematical Programming, 1997
- A language and a program for stating and solving combinatorial problemsArtificial Intelligence, 1978