Knowledge-Driven Interval Multi-Objective Scheduling for Green Construction Under Time-Varying Carbon Emission Factors
Open Access
Abstract
Reducing carbon emissions during construction is essential for meeting dual carbon targets. Current green scheduling methods assume fixed emission factors, overlooking time-dependent variations driven by grid peak-valley patterns. Under interval duration uncertainty coupled with tight dynamic carbon budgets, conventional algorithms struggle with sparse feasible solutions and slow Pareto front convergence. We formulate a bi-objective interval RCPSP model with time-varying carbon emission factors that minimizes both interval makespan and total carbon emissions. A possibility degree measure converts scalar carbon budgets into linearized hard constraints. To solve this NP-hard problem, we propose the Knowledge-Driven Interval Multi-Objective Evolutionary Algorithm (KD-IMOEA), which integrates four components: Knowledge-Driven Initialization (KDI), Adaptive Time-window Carbon-aware Decoding (TCD), Carbon Budget-aware Repair Mutation (CBM), and Interval Pareto Elite Archive (IPA), forming an end-to-end carbon-aware optimization pipeline. We validate KD-IMOEA on J30 through J120 benchmark instances; results show it outperforms four established algorithms, including NSGA-II, in both convergence and distribution, with hypervolume (HV) gains up to 6.3%. A green building case study confirms that KD-IMOEA exploits spatiotemporal decoupling to identify float time and assign energy-intensive machinery to lower-carbon operating profiles. At the optimal compromise makespan of 169.5 days, this strategy cuts carbon emissions by 3.07% over traditional baselines, enabling management-driven emission savings without extending project duration.Keywords
Funding Information
- Chinese Academy of Social Sciences (No. 23XGL016)
This publication has 32 references indexed in Scilit:
- Multi-scale performance of underwater-castable ultra-high-volume fly-ash eco-friendly engineered cementitious composites: Microstructural characterization, workability, mechanical properties and environmental effectsConstruction and Building Materials, 2025
- Seismic performance of CFRP-strengthened steel fiber reinforced concrete composite columns: Experimental, numerical and theoretical analysesConstruction and Building Materials, 2025
- Axial compressive performance of CFRP-steel composite tube confined seawater sea-sand concrete intermediate slender columnsConstruction and Building Materials, 2024
- Extensions of the resource-constrained project scheduling problemAutomation in Construction, 2023
- Software project scheduling under activity duration uncertaintyAnnals of Operations Research, 2023
- An updated survey of variants and extensions of the resource-constrained project scheduling problemEuropean Journal of Operational Research, 2022
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problemEuropean Journal of Operational Research, 2020
- The Taguchi methodWIREs Computational Statistics, 2011
- Experimental investigation of heuristics for resource-constrained project scheduling: An updateEuropean Journal of Operational Research, 2006
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computationEuropean Journal of Operational Research, 1996