Effect of Building Information Modeling (BIM) on reduced construction time-costs: a case study
Authors:
Open Access
- 10 November 2020
- conference paper
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 202, 02012
Abstract
Building Information Modeling (BIM) is an interesting study to be explored by technological developments. Especially with the Covid-19 pandemic, construction actors are encouraged to work according to the applicable protocol. BIM as integrated tool for managing projects from the beginning to the end of the work. On one side the classic problems of construction projects are high costs, late time, and quality that is not according to specifications. The purpose of this study is to analyze the effect of the use of BIM in construction projects on time and cost. A case study was carried out on a construction project that had implemented BIM. The results showed the use of BIM could cut time by 50% faster and reduce costs by 52.36%. This time and cost-effectiveness are caused by the number of workers needed and the reduced duration so that it has an impact on fundin.Keywords
This publication has 18 references indexed in Scilit:
- Building Information Modeling (BIM) for green buildings: A critical review and future directionsAutomation in Construction, 2017
- Work packaging with BIMAutomation in Construction, 2017
- The Identification of Waste Construction at Construction Project Life CycleAdvanced Science Letters, 2017
- A State-of-the-Art Review on the Integration of Building Information Modeling (BIM) and Geographic Information System (GIS)ISPRS International Journal of Geo-Information, 2017
- BIM and GIS Integration and Interoperability Based on Semantic Web TechnologyJournal of Computing in Civil Engineering, 2016
- Integrating BIM and GIS to improve the visual monitoring of construction supply chain managementAutomation in Construction, 2013
- Risk matrix for factors affecting time delay in road construction projects: owners' perspectiveEngineering, Construction and Architectural Management, 2011
- Project cost estimation using principal component regressionConstruction Management and Economics, 2005
- The Case for Specialist Training for Learning Support Assistants Employed in Schools for Children with Severe, Profound and Multiple Learning DifficultiesSupport for Learning, 2000
- Factors influencing construction time and cost overruns on high-rise projects in IndonesiaConstruction Management and Economics, 1997