Minimizing flow time in a flow-line manufacturing cell with family setup times
Authors:
- 1 February 2006
- journal article
- Published by Taylor & Francis in Journal of the Operational Research Society
- Vol. 57 (2) , 163-176
Abstract
Journal of the Operational Research Society (JORS) is the world's longest established OR journal and an official journal of The OR Society. It is the aim of the Journal to present papers which are relevant to practitioners, researchers, teachers, students and consumers of operational research, and which cover the theory, practice, history or methodology of OR.Keywords
This publication has 16 references indexed in Scilit:
- Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separatedJournal of the Operational Research Society, 2004
- A review of scheduling research involving setup considerationsOmega, 1999
- Survey of scheduling research involving setup timesInternational Journal of Systems Science, 1999
- A genetic algorithm for family and job scheduling in a flowline-based manufacturing cellComputers & Industrial Engineering, 1994
- An efficient heuristic approach to the scheduling of jobs in a flowshopEuropean Journal of Operational Research, 1992
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and ComplexityJournal of the Operational Research Society, 1992
- A simulated annealing approach to scheduling a manufacturing cellNaval Research Logistics (NRL), 1990
- Group Technology1985
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- Minimizing the Sum of Completion Times of n Jobs over m Machines in a Flowshop—A Branch and Bound ApproachA I I E Transactions, 1977