Wind-Wise Automated Stability Analysis for Selection of Tower Crane and Location
- 1 November 2022
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 148 (11) , 04022127
Abstract
Extreme wind speeds pose a serious threat to tower crane stability and can lead to excessive deflections or overturning of the mast. However, wind effects might not be considered directly in either the tower crane stability analysis or in the selection of a tower crane and use location. This problem may lead to crane failures or incidents due to extreme weather or improper selection of the crane foundation. To address these limitations, the present study proposes an automated system that includes: (1) mathematical models to determine the locations of the tower crane and the material supply, seeking to minimize not only lifting moments but also tower crane travel times; and (2) a static wind-based tower crane stability analysis to support the selection of a tower crane, which is the dimensions of its foundation that produce the most stable crane foundation system. A case study including 514 crane and material supply locations is adopted to validate the effectiveness of the proposed methodology.Keywords
This publication has 38 references indexed in Scilit:
- Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programmingAutomation in Construction, 2011
- Automatic optimal design algorithm for the foundation of tower cranesAutomation in Construction, 2011
- Effects of a Construction Tower Crane on the Wind Loading of a High-Rise BuildingJournal of Structural Engineering, 2010
- Bearing capacity of soils for crawler cranesCanadian Geotechnical Journal, 2008
- Wind tunnel test method to study out-of-service tower crane behaviour in storm windsJournal of Wind Engineering and Industrial Aerodynamics, 2004
- GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing constructionConstruction Management and Economics, 2003
- An algorithm for mobile crane selection and location on construction sitesConstruction Innovation, 2001
- Prediction of hoisting time for tower cranes for public housing construction in Hong KongConstruction Management and Economics, 1999
- A computer‐based model for optimizing the location of a single tower craneBuilding Research & Information, 1996
- Cranes in storm windsEngineering Structures, 1981