Nondestructive millimeter-scale void detection for thick steel-shell–concrete interface of immersed tube tunnel: case study
Authors:
- 5 July 2023
- journal article
- research article
- Published by SAGE Publications in Structural Health Monitoring
- Vol. 23 (2) , 1107-1122
Abstract
The structural form of sandwich-structured immersed tunnel (SSIT) can be complex. During the casting of self-compacting concrete, creating void defects between the steel shell and concrete interface is not difficult, which can adversely affect the overall safety and service life of the structure. However, detecting millimeter-scale voids covered by a thick steel plate is a technical challenge for current engineering industries. In this study, we proposed a nondestructive millimeter-scale void detection method for SSITs with thick steel shells by combining impact imaging and neutron methods. First, based on the near-source wavefield theory and count rate of thermal neutrons, the void area and depth calculation methods were derived theoretically, and then the coupling detection method and grading criteria for void severity were proposed. Additionally, the void detection performance was validated for a full-scale SSIT model test by blind detection. Finally, the proposed method was applied to the SSIT of the Shenzhen–Zhongshan bridge. The results showed that the proposed method could quantitatively determine the location and distribution pattern of a void; however, it could not accurately determine the void depth. In contrast, the neutron method could accurately calculate the void depth but had a large minimum detectable unit area. The proposed method could effectively compensate for the limitations of both methods. Statistically, the coincidence rate of the model test was 95%, 89%, and 87.5% for the void location, void area, and void depth, respectively, when the error range was ±2 mm. Using this method, 30 tubes in the Shenzhen–Zhongshan bridge were inspected, and by summarizing the void law, suggestions to improve the casting process were proposed, such as adjusting the casting speed. Meanwhile, the void probability decreased significantly. The proposed method provides an important basis for high-quality construction in SSIT projects.Keywords
Funding Information
- Five Talents Program of IWHR (SD0145B042021)
- State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin (SKL2020ZY10)
- State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin (SKL2022TS15)
- R&D projects in key areas of Guangdong province (20191105)
This publication has 5 references indexed in Scilit:
- Consideration of concrete and steel sandwich tunnel elementsTunnelling and Underground Space Technology, 2022
- Bending Capacity of Steel-Concrete-Steel Composite Structures Considering Local Buckling and Casting ImperfectionJournal of Structural Engineering, 2019
- An impact imaging method for monitoring on construction of immersed tube tunnel foundation treated by sand-filling methodTunnelling and Underground Space Technology, 2019
- Dynamic Response of the Foundations Resting on a Two-layered Soil Underlain by a Rigid LayerGeotechnical and Geological Engineering, 2012
- Steel-shell immersed tunnels— Forty years of experienceTunnelling and Underground Space Technology, 1997