Single-machine scheduling with preemptive jobs and workload-dependent maintenance durations
- 5 May 2015
- journal article
- Published by Springer Nature in Operational Research
- Vol. 15 (3) , 423-436
Abstract
No abstract availableKeywords
This publication has 27 references indexed in Scilit:
- Scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespanEuropean Journal of Operational Research, 2008
- Optimization models for the tool change scheduling problemOmega, 2008
- Scheduling with tool changes to minimize total completion time under controllable machining conditionsComputers & Operations Research, 2007
- An efficient algorithm for scheduling jobs on a machine with periodic maintenanceThe International Journal of Advanced Manufacturing Technology, 2006
- Single-machine scheduling with flexible and periodic maintenanceJournal of the Operational Research Society, 2006
- Minimizing total flow time in the single-machine scheduling problem with periodic maintenanceJournal of the Operational Research Society, 2006
- Scheduling of jobs and maintenance in a textile companyThe International Journal of Advanced Manufacturing Technology, 2006
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performanceEuropean Journal of Operational Research, 2004
- Convex Optimization2004
- Scheduling with tool changes to minimize total completion time: A study of heuristics and their performanceNaval Research Logistics (NRL), 2002