Abstract
The application of a fuzzy preference relation on a set of alternatives for decision support in utility network design and development under uncertainty in the initial data is considered. A mathematical model for distributing work volumes among the stages of utility network construction or reconstruction is used to generate a set of feasible alternatives. The model is formulated as a Boolean programming problem with interval coefficients of the objective function. It is shown that partial overlapping of interval objective-function values may prevent the unambiguous ordering of feasible alternatives using direct interval comparison. To address this problem, an approach based on a fuzzy preference relation is proposed. For the single-criterion formulation, membership functions of the preference relation are determined and a set of nondominated alternatives is constructed. For the multicriteria formulation, separate preference relations are constructed for individual criteria and subsequently aggregated. The proposed approach formalizes the selection of a compromise design solution under interval uncertainty. A numerical example demonstrates the comparison of three feasible alternatives and the selection of the alternative with the maximum degree of nondominance.