Optimal hybrid push/pull control strategies for a parallel multistage system: Part I
Authors:
- 1 June 1991
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 29 (6) , 1279-1287
Abstract
A multistage production/inventory system is modelled. The system structure, which has the form of an assembly network, is abstracted from the production process of a typical integrated iron and steel works. The system is modelled as a Markov Decision Process (MDP). Combinations of Just-In-Time (pull) and MRP (push) policies are used as alternatives in the MDP. Optimal hybrid strategies are developed. In part II, we extend our observations to a more general case.Keywords
This publication has 14 references indexed in Scilit:
- INTEGRATING KANBAN TYPE PULL SYSTEMS AND MRP TYPE PUSH SYSTEMS: INSIGHTS FROM A MARKOVIAN MODELIIE Transactions, 1992
- A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal KanbansInternational Journal of Production Research, 1990
- Just-In-Time supplier inventory: an empirical implementation modelInternational Journal of Production Research, 1989
- Kanban Controlled Pull Systems: An Analytic ApproachManagement Science, 1989
- A methodology for computation reduction for specially structured large scale Markov decision problemsEuropean Journal of Operational Research, 1988
- A Mathematical Programming Approach to a Deterministic Kanban SystemManagement Science, 1987
- Just-in-time manufacturing system: a periodic pull systemInternational Journal of Production Research, 1985
- A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEMDecision Sciences, 1983
- Desiǵn and analysis of Pull System, a method of multi-staǵe production controlInternational Journal of Production Research, 1981
- Computation techniques for large scale undiscounted markov decision processesNaval Research Logistics Quarterly, 1979