Estimating total and specific process capability indices in three-stage processes with measurement errors
- 17 July 2018
- journal article
- research article
- Published by Taylor & Francis in Journal of Statistical Computation and Simulation
- Vol. 88 (15) , 3033-3064
Abstract
In multistage processes, two kinds of process capability indices (specific and total process capability indices) are defined in each stage. The total process capability index calculates the capability of each stage when it is affected by the previous stages and the specific process capability index calculates the capability of the stage when the effects of the previous stages are eliminated. Process capability indices in multistage processes are proposed under the assumption of no measurement errors. However, sometimes this assumption may be violated and leads to misleading interpretations. In this paper, the effects of measurement errors on the specific and total process capability indices in the second and third stages of the three-stage processes are statistically analysed. In addition, the effects of the measurement errors on the bias and the mean square error value of the total and specific process capability indices in the second and third stages are studied. Finally, the effects of the measurement errors on the specific and total process capability indices are shown through a numerical example.Keywords
This publication has 22 references indexed in Scilit:
- On the Monitoring of Linear Profiles in Multistage ProcessesQuality and Reliability Engineering International, 2013
- A bibliography of the literature on process capability indices: 2000–2009Quality and Reliability Engineering International, 2011
- Multivariate process capability using principal component analysis in the presence of measurement errorsAStA Advances in Statistical Analysis, 2011
- Using cause selecting control charts to monitor dependent process stages with attributes dataExpert Systems with Applications, 2011
- Properties of multivariate process capability in the presence of gauge measurement errors and dependency measure of process variablesJournal of Manufacturing Systems, 2010
- Estimation ofCpm when Measurement Error is PresentQuality and Reliability Engineering International, 2005
- Process Capability Improvement for Multistage ProcessesQuality Engineering, 2002
- ESTIMATION OFCpFOR AUTOCORRELATED DATA AND MEASUREMENT ERRORSCommunications in Statistics - Theory and Methods, 2002
- Statistical analysis of process capability indices with measurement errorsQuality and Reliability Engineering International, 2002
- A new diagnosis theory with two kinds of qualityTotal Quality Management, 1990