Bi-objective multi-resource scheduling problem for emergency relief operations
- 26 October 2018
- journal article
- research article
- Published by Taylor & Francis in Production Planning & Control
- Vol. 29 (14) , 1191-1206
Abstract
Resource scheduling for emergency relief operations is complex as it has many constraints. However, an effective allocation and sequencing of resources are crucial for the minimization of the completion times in emergency relief operations. Despite the importance of such decisions, only a few mathematical models of emergency relief operations have been studied. This article presents a bi-objective mixed integer programming (MIP) that helps to minimize both the total weighted time of completion of the demand points and the makespan of the total emergency relief operation. A two-phase method is developed to solve the bi-objective MIP problem. Additionally, a case study of hospital network in the Melbourne metropolitan area is used to evaluate the model. The results indicate that the model can successfully support the decisions required in the optimal resource scheduling of emergency relief operations.Keywords
This publication has 54 references indexed in Scilit:
- A joint production scheduling approach considering multiple resources and preventive maintenance tasksInternational Journal of Production Research, 2012
- Special Features: Health Policy: Hospital Nurse Staffing and Public Health Emergency Preparedness: Implications for PolicyPublic Health Nursing, 2010
- A concise guide to the Traveling Salesman ProblemJournal of the Operational Research Society, 2010
- Scheduling of unrelated parallel manufacturing cells with limited human resourcesInternational Journal of Production Research, 2008
- Multi-objective optimal planning for designing relief delivery systemsTransportation Research Part E: Logistics and Transportation Review, 2007
- An emergency logistics distribution approach for quick response to urgent relief demand in disastersTransportation Research Part E: Logistics and Transportation Review, 2007
- The multiple traveling salesman problem: an overview of formulations and solution proceduresOmega, 2006
- An efficient algorithm for operation insertion in a multi-resource job-shop schedule with sequence-dependent setup timesProduction Planning & Control, 2002
- A simple and effective heuristic for the resource constrained project scheduling problemInternational Journal of Production Research, 2001
- Incorporating human resources in group technology/cellular manufacturingInternational Journal of Production Research, 1998