A new method for simultaneous optimizing of wind farm’s network layout and cable cross-sections by MILP optimization
- 1 November 2016
- journal article
- Published by Elsevier in Applied Energy
- Vol. 182, 525-538
Abstract
No abstract availableThis publication has 35 references indexed in Scilit:
- Optimal placement of wind turbines within wind farm using binary particle swarm optimization with time-varying acceleration coefficientsRenewable Energy, 2013
- Design of wind farm layout using ant colony algorithmRenewable Energy, 2012
- Overall design optimization of wind farmsRenewable Energy, 2011
- Optimization of wind farm turbines layout using an evolutive algorithmRenewable Energy, 2010
- New approach on optimization in placement of wind turbines within wind farm by genetic algorithmsRenewable Energy, 2010
- Electricity generation scheduling with large-scale wind farms using particle swarm optimizationElectric Power Systems Research, 2009
- An optimization approach for wind turbine commitment and dispatch in a wind parkElectric Power Systems Research, 2009
- The cable trench problem: combining the shortest path and minimum spanning tree problemsComputers & Operations Research, 2002
- Topological design of telecommunication networks-local access design methodsAnnals of Operations Research, 1991
- Topological design of centralized computer networks—formulations and algorithmsNetworks, 1982