Optimization of leaching parameters for the extraction of rare earth metal using decision making method
Authors:
- S.S. BaralSBS.S. Baral
- K. Raja ShekarKSK. Raja Shekar
- Megha SharmaMSMegha Sharma
- P.V. RaoPRP.V. Rao
- 1 March 2014
- journal article
- Published by Elsevier in Hydrometallurgy
- Vol. 143, 60-67
Abstract
No abstract availableThis publication has 22 references indexed in Scilit:
- A state-of the-art survey of TOPSIS applicationsExpert Systems with Applications, 2012
- Leaching kinetics of bastnaesite concentrate in HCl solutionTransactions of Nonferrous Metals Society of China, 2011
- Study on Leaching Process of Activation Bastnaesite by HCl SolutionAdvanced Materials Research, 2011
- Performance measurement model for Turkish aviation firms using the rough-AHP and TOPSIS methods under fuzzy environmentExpert Systems with Applications, 2011
- Integrated water resource security evaluation of Beijing based on GRA and TOPSISFrontiers of Earth Science in China, 2010
- Probabilistic multicriteria analyses for optimal biomass power plant designElectric Power Systems Research, 2008
- Preparation of enriched cerium oxide from bastnasite with hydrochloric acid by two-step leachingMetallurgical and Materials Transactions B, 2006
- Attribute based specification, comparison and selection of a robotMechanism and Machine Theory, 2004
- USING MULTIPLE CRITERIA DECISION ANALYSIS FOR SUPPORTING DECISIONS OF SOLID WASTE MANAGEMENTJournal of Environmental Science and Health, Part A, 2002
- Computer aided robot selection: the ‘multiple attribute decision making’ approachInternational Journal of Production Research, 1991